Skip to Content


Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO

The energy efficiency and renovation project of the State Kindergarten in the Municipality of Gaglianico (BI) participated in and won the Ministry of Education's call for proposals. The RIADATTO studio was involved in all phases of the project, from preparing the documentation for the call, through the various design phases, to overseeing the work and coordinating safety.

The school has been made beautiful, safe, and sustainable.

The work has radically changed the energy aspect, improving performance and capacity (from the external insulation to the new fixtures, a complete overhaul that projects the institution into a green future). The internal spaces have been completely redesigned, and the entire structure has been made safe. An outdoor classroom has also been created in the external area, always with trauma-proof flooring. The absolute protagonist of the project is color as a guiding line of the concept. From the external and internal walls to the choice of tiles, the wise and accurate use of colors is the key to understanding the project: designed to stimulate children's perception. To spark imagination, provide vitality, and promote well-being.

Co-designers: Arch. Caterina Capri, Geom. Francesco Vantaggiato, Ing. Anna Porro, Dr. Silvia Remondino, Arch. Monica Doniselli

Image credits: Elisabetta Massera


Energy efficiency and renovation of the State Kindergarten


Location: Gaglianico
Client: Municipality of Gaglianico (BI)
Years: 2015 – 2019 – Completed
Project level: Technical and economic feasibility project, Final project, Executive project, Work management and Safety coordination
Dimensions: 935 m²

Economic framework amount: € 657.000


Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO
Riqualificazione energetica e di ristrutturazione della Scuola d’Infanzia Statale | RiADATTO